Vale of Rheidol Railway

From Wikishire
Jump to: navigation, search
Vale of Rheidol Railway
Welsh: Rheilffordd Cwm Rheidol

Cardiganshire

Vale of Rheidol Railway - geograph.org.uk - 460576.jpg
Llywelyn climbing to Devil's Bridge
Gauge: 23.75"
Location: 52°24’40"N, 4°4’45"W
No. of stations: 4 stations 5 halts
Track: 11¾ miles
Information
Operated by: Vale of Rheidol Railway Limited

The Vale of Rheidol Railway is a 23¾-inch narrow gauge heritage railway that runs for 11¾ miles between Aberystwyth and Devil's Bridge in Cardiganshire.[1]

Until privatisation, the line was the sole steam-operated line on the nationalised British Rail network, steam traction having ceased in 1968 on all other parts of the system.

Unlike other railways in the United Kingdom, the Vale of Rheidol Railway has never closed, with the exception of wartime and has operated a service for tourists through its life. The railway celebrated its centenary in 2002.

History

A narrow gauge railway in the area of Aberystwyth was first proposed after the initial route planned for the Manchester and Milford Railway, from Llanidloes to Aberystwyth by way of Devil's Bridge, was altered, and then abandoned, before construction started.[2]

The original primary purpose of the line was to carry timber and ore from the Rheidol Valley to the sea and the main-line railway at Aberystwyth. Many lead mines in the valley were producing ore at the end of the 19th century. Construction began in 1901 following an Act of Parliament in 1897. Rock was hand-hewn instead of being blasted, in order to save money.

By the time the railway was ready to open in 1902, lead mining in Cardiganshire was in steep decline. However a significant growth in tourism was under way, and the carriage of passengers soon became the principal traffic of the railway. It opened for mineral traffic in August 1902 and for passengers on 22 December 1902.

Branch line

The line lost its independence when it was absorbed by the Cambrian Railways on 1 July 1913,[3] however the onset of war in 1914 prevented major improvements being carried out.[4] Passenger services were cut back however and the need for timber for the war effort meant that freight became the principal revenue source for a short while.[5]

On 1 January 1922, it was grouped into the Great Western Railway (GWR).[6] The GWR turned it into a service solely for tourists, freight services being withdrawn, and from 1931 trains only operated during the summer months. The entire line was closed for the duration of Second World War, though maintenance continued. The railway re-opened in 1945.

Prince of Wales with British Rail logo in 1981

The Great Western Railway became part of the Western Region of British Railways on 1 January 1948 and the line continued to operate a tourist service.[7]

In 1968, the line was rerouted in Aberystwyth to run adjacent to the BR line into the former standard-gauge Carmarthen line platforms of the main station which had been abandoned in 1964. The former standard-gauge locomotive shed was also refurbished and adapted into use for this railway.[8] The former station site is now occupied by a supermarket and the former route of this alignment has been sold for redevelopment.

Privatisation

The line was privatised in 1989, sold to Peter Rampton and Tony Hills (later owner and General Manager of the Brecon Mountain Railway).[9] In 1996, Rampton and Hills split their partnership, with Hills retaining control of the Brecon, and the Rheidol being sold to a trust formed by Rampton, the Phyllis Rampton Narrow Gauge Railway Trust.[10]

The railway today

The railway continues to operate as a tourist railway, generally operating between Easter and the end of October with extra services during February Half Term and Santa Specials at Christmas.

There are various developments planned to enhance the facilities and visitor experience. In 2010 work started at Aberystwyth on construction of a new locomotive and carriage works.

Rheidol Explorer

The railway has developed the Rheidol Explorer audio tour was developed during 2011 and uses GPS handsets to provide passengers with a commentary during the journey.

The route

There are nine stations. Whilst all trains generally stop at block stations, for operational reasons, the other intermediate stations are treated as request stops. The journey takes one hour in each direction and much of it at a gradient of 1 in 50.

Aberystwyth Station Aberystwyth Railway Station - geograph.org.uk - 606005.jpg 52°24’40"N, 4°4’45"W The headquarters of the railway, sharing a terminus with the standard gauge main line trains
Various Sheds 52°24’41"N, 4°4’43"W
Llanbadarn Station Llanbadarn(1).jpg 52°24’20"N, 4°3’40"W A request stop serving the village of Llanbadarn Fawr. There are no surfaced platforms or buildings.
over River Rheidol
crossing
Glanyrafon Halt Glanyrafon Station - geograph.org.uk - 769086.jpg 52°24’16"N, 4°2’13"W A request stop serving the nearby industrial estate. There are no surfaced platforms or buildings.
crossing
Capel Bangor Station Capel Bangor Station view.jpeg 52°23’58"N, 3°59’21"W Close to the village of Capel Bangor. New platforms and a station building (a replica of the original) were built in 2012
crossing
Nantyronen Station Nantyronen railway station platform.jpeg A request stop. Up trains pause briefly here to allow the locomotive to take on water. New platform and station building completed in 2013.
Aberffrwd Station Aberffrwd railway station water tower.jpg 52°23’26"N, 3°55’51"W Close to the hamlet of Aberffrwd. New platform and station building completed in 2013.
Rhiedol Falls Station Rheidol Falls railway station VOR.jpeg 52°23’30"N, 3°54’1"W A request stop. New platform and station building completed in 2013.
Rhiwfron Station Rhiwfron railway station VOR.jpeg 52°23’0"N, 3°52’5"W A request stop. New platform and station building completed in 2013.
Devil's Bridge Devils Bridge Station.JPG 52°22’34"N, 3°51’17"W the railway's eastern terminus. It is a short walk from the Mynach Waterfalls.

When the lead mines were being worked there was an aerial cableway linking them with Rhiwfron.

The railway had a branch line which ran to Aberystwyth Harbour, principally for freight services. The Harbour Branch became redundant with the predominance of tourist passenger operations and was closed and lifted. Little evidence of it remains today.

Operation

The line has three steam locomotives for passenger trains and one diesel locomotive. The railway also owns 16 carriages and a 4-wheeled brake van.

The railway is single track with passing loops at Capel Bangor and Aberffrwd which are operated by the train crew. The line is worked by tokens, which authorise the driver to enter a single line section. Tokens are provided for:

The Duty Officer regulates train running, giving permission for trains to enter the single line sections, recording train movements on the Train Graph and ensuring trains are formed of an appropriate number of carriages.

Pictures

Outside links

Commons-logo.svg
("Wikimedia Commons" has material
about Vale of Rheidol Railway)

References

  1. Johnson 1999, page 15
  2. Johnson 2011, page 52
  3. Green 1986, page 26
  4. Green 1986, page 28
  5. Green 1986, page 28
  6. Green 1986, page 28
  7. Green 1986, page 29
  8. Johnson 2011, page 88
  9. "The Great British Rail Sale is Over" The Railway Magazine issue 1152 April 1997 pages 24/25
  10. Boyd-Hope, Gary (January 2009). "Rheidol revival: 20 years of private enterprise". Steam Railway 358: 91–5. 

Books

  • Green, CC (1986). The Vale of Rheidol Light Railway. Wild Swan. ISBN 0-906867-43-6. 
  • Johnson, Peter (1999). Welsh Narrow Gauge: a view from the past. Ian Allan Publishing. ISBN 0-7110-2654-8. 
  • Johnson, Peter (2011). An Illustrated History of the Great Western Narrow Gauge. OPC. ISBN 978-0-86093-636-7.