Barton Swing Aqueduct

From Wikishire
Revision as of 12:14, 28 June 2016 by Owain (talk | contribs) (Created page with "{{Infobox bridge |name= Barton Swing Aqueduct |county=Lancashire |type=Swing bridge |picture = Barton Swing Aqueduct.jpg |picture caption = The aqueduct in the closed posi...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Barton Swing Aqueduct
Lancashire

The aqueduct in the closed position
Location
Type: Swing bridge
Carrying: Bridgewater Canal
Crossing: Manchester Ship Canal
Location
Grid reference: SJ767976
Location: 53°28’29"N, 2°21’8"W
Structure
Length: 330 ft
No. of spans: Two (Central Pivot)
Type: Swing bridge
History
Built 1893
Architect: Sir Edward Leader Williams
Information

The Barton Swing Aqueduct is a moveable aqueduct in Barton-upon-Irwell, Lancashire. It carries the Bridgewater Canal across the Manchester Ship Canal. The swinging action allows large vessels using the ship canal to pass underneath and smaller [[narrowboat]s to cross over the top. The aqueduct, the first and only swing aqueduct in the world,[1] is a Grade II* listed building,[2] considered a major feat of Victorian civil engineering.[2][3] Designed by Sir Edward Leader Williams and built by Andrew Handyside and Company of Derby, the swing bridge opened in 1894 and remains in regular use.

History

The Barton Swing Aqueduct is a direct replacement for the earlier Barton Aqueduct, a masonry structure crossing the River Irwell and completed in 1761. The construction of the Manchester Ship Canal in the 1890s necessitated the replacement of this structure, as the height of ships using the new ship canal was too great to pass under the old aqueduct. An alternative scheme involving the use of a double lock flight was rejected, because of the need to conserve water in the Bridgewater Canal above.

The new aqueduct was designed by Sir Edward Leader Williams,[2] engineer to the Manchester Ship Canal Company, and was built by Andrew Handyside and Company of Derby. The first barge crossed the new aqueduct on 21 August 1893, and it opened to commercial traffic on 1 January 1894.[4] Williams was also involved with the Anderton Boat Lift, another moving canal structure in the region.

Construction

The swing aqueduct in open position. At this point transit through the Manchester Ship Canal is possible.

Construction work began in 1890, with the demolition of a Roman Catholic school on the south bank of the ship canal. The scale of the operation meant that the course of the River Irwell had to be temporarily diverted around the site, so that the central island could be built on dry land.

Operation

The swing aqueduct in the closed position, showing the Bridgewater Canal crossing over the Ship Canal. The Barton Road Swing Bridge is on the right.

The aqueduct is a form of swing bridge. When closed, it allows canal traffic to pass along the Bridgewater Canal. When large vessels need to pass along the ship canal underneath, the 1, 420-ton[3] and 330-ft-long iron trough is rotated 90 degrees on a pivot mounted on a small purpose-built island. Gates at each end of the trough retain around 800 tons of water; additional gates on each bank retain water in their adjacent stretches of canal.[3] The aqueduct originally had a suspended towpath along its length, about nine feet above the water level of the Bridgewater Canal, which has now been removed.

The structure is adjacent to, and upstream of, the Barton Road Swing Bridge. Both bridges are operated from a brick control tower on an island in the centre of the ship canal. When in the open position, the aqueduct and road bridge line up along the length of the island, allowing ships to traverse each side.[5] To avoid the risk of collision, the aqueduct is opened half an hour before traffic on the Manchester Ship Canal is scheduled to pass.

Turning mechanism

Two barriers are extended across the Bridgewater Canal before the bridge is swung. Here the inner barrier is only extended part way.

The turning mechanism built into the central island consists of a 27-ft race plate embedded in granite blocks. Sixty-four tapered cast iron rollers sit on top of the race plate, held in position by a spider ring. On top of that an upper race plate supports the aqueduct and its circular gear rack, which was powered by a hydraulic engine manufactured by Sir W. G. Armstrong Mitchell of Newcastle. Hydraulic power was originally supplied by steam from two Lancashire boilers housed in a pumping station on the Eccles bank of the ship canal; a service culvert beneath the bed of the canal conveyed the water under pressure to the control tower on the island. In 1939 the original hydraulic engines were replaced by a pair of radial three-cylinder engines manufactured by the Hydraulic Engineering Company of Chester, and the following year a power house was built on the island to house two electrically driven pumps. The old steam pumping station was demolished after the Second World War.

References

Notes

Bibliography

  • Atkinson, Glen (2002), Barton's Bridges, Neil Richardson, ISBN 978-1-85216-146-0 
  • Fisher, Stuart (2013), The Canals of Britain: A Comprehensive Guide, A&C Black, ISBN 978-1-4081-0524-5 
  • Nevell, Mike (1997), The Archaeology of Trafford, Trafford Metropolitan Borough with University of Manchester Archaeological Unit, ISBN 978-1-870695-25-1 
  • Ryall, M. J. (2000), The Manual of Bridge Engineering, Thomas Telford, ISBN 978-0-7277-2774-9 

Further reading

  • Cossons, Neil (1987), The BP Book of Industrial Archaeology, David & Charles 
  • Fletcher, John C. (1992), The History and Operation of Barton Swing Aqueduct, John & Margaret Fletcher, ISBN 978-0-9519058-0-7 

Outside links

("Wikimedia Commons" has material
about Barton Swing Aqueduct)