Tissington Trail

From Wikishire
Jump to: navigation, search
Coldeaton Cutting on the Tissington Trail
The Tissington Trail just south of Parsley Hay
The restored Hartington Signal Box beside the trail
The old Tissington station

The Tissington Trail is a bridleway, footpath and cycleway in Derbyshire, along part of the trackbed of the former railway line connecting Ashbourne to Buxton. It takes its name from the village of Tissington, which it skirts.

The trail was opened in 1971, and is now a part of the National Cycle Network. It stretches for thirteen miles from Parsley Hay (53°10’14"N, 1°46’58"W) in the north to Ashbourne (53°1’11"N, 1°44’23"W) in the south.

At Parsley Hay, a hamlet to the north-east of Hartington, the trail is joined by the High Peak Trail, another rail trail which is 17 miles long from High Peak Junction near Cromford (by Matlock), to Dowlow (near Buxton).

The trail has a firm crushed-limestone surface suitable for cyclists, walkers and wheelchair users. It has easy level access at many points along its route. The elevated nature of the line (at Parsley Hay it is over 1,000 feet above sea level) means that it affords good views, but it is exposed in poor weather. The trail runs gently downhill from Parsley Hay southwards, but about a quarter of a mile north of the cycle hire centre at Mapleton Lane, Ashbourne, the trail dips down and up where a viaduct has been removed; both slopes are about 130 feet long with gradients of 1:9.

Hartington signal box, beside the trail although some distance from the village, has been converted to an Information Centre, open in summer on Saturdays, Sundays and Bank Holidays. The National Park Authority operates cycle hire at both ends of the trail.

From Hartington station northwards, the route is part of the Pennine Bridleway, a 130-mile leisure route which includes 73 miles through Derbyshire to the South Pennines. The bridleway has two southern starting points, and another at Middleton Top, near Cromford, on the High Peak Trail.

History of the route

Built by the LNWR, the line opened in 1899, and linked with the Cromford and High Peak Railway at Parsley Hay, a line completed nearly 70 years earlier to link the Cromford Canal wharf at High Peak Junction with the Peak Forest Canal at Whaley Bridge. It was the last of the railways to be built in the Peak District. Whilst the section from Parsley Hay to Ashbourne was single track (from Parsley Hay north to Buxton it was double) the formation was constructed to allow for doubling if necessary, but this never happened. There were passing loops at Hartington, Alsop-en-le-Dale, Tissington and Thorpe Cloud.

Despite the relatively short length of this branch line, it was deservedly popular with walkers and ramblers, enjoying its heyday in the 1930s. Apart from the elevated views over the Peak itself, a large attraction was that this line passed close to Dovedale. The line for a time also carried a through-service for passengers from London Euston (via Nuneaton, Uttoxeter and Ashbourne) to Buxton and Manchester. A daily train also transported local milk to London. However, the line suffered from passing through a sparsely populated area, and it was closed to regular passenger traffic in 1954, and all services between Ashbourne and Hartington, including excursion traffic and specials (such as run during bad weather, or well dressing specials), ceased in October 1963. The route between Hartington and Parsley Hay survived until October 1967.

Common Spotted Orchid on Tissington Trail

See also

Outside links

References

Blakemore, M. & Mosley D., "Railways of the Peak District", Atlantic Publishers, 2003, ISBN 1-902827-09-0